Issue one scope to every supplier, then compare the offers against that scope. We coordinate China sourcing for steel frames and record missing documents, unresolved interfaces and shipment assumptions for buyer review.

Review the load columns

Three checks before release

  1. Loads. Design wind speed, ground snow load and seismic design category or PGA, each with a unit.
  2. Steel. Main frame Q355 or S355, secondary galvanized coating mass, bolt grade.
  3. Fire strategy. Who owns the rating: panel core, or the whole wall with joints and openings.

Two load columns, one project

A North American bid and a European bid can use different wind and snow definitions. The table shows fields to ask for, with example values only where marked. Have the project engineer specify governing editions, exposure and risk classification.

Input Sample basis A, ASCE 7 path Sample basis B, Eurocode 3 path
Design wind speed Example only: 45 m/s, subject to exposure and project basis Basic wind velocity from the national annex, not copied from column A
Ground snow load Example only: 1.5 kN/m² ground snow Characteristic snow on the ground from the national annex
Seismic design basis 0.30 g example, or the seismic design category if the buyer uses that label Peak ground acceleration and importance class from the applicable national annex
Main frame steel Q355, mill certificate heat number filed S355, with the execution class stated if EN 1090 is in the contract
What this table does not do It does not grant IBC compliance It does not grant Eurocode or EN 1090 compliance

A velocity and its units are insufficient for comparison without the averaging period and exposure basis. Ground snow and roof snow also need separate fields because drifting at an attached bay can control the roof design.

Limits that stay on the specification sheet

Material and welding sequence

Coordinate a sample connection, coating coupon or cladding panel if a material decision depends on physical review. Record which drawing revision and supplier lot each sample represents. Ask the shortlisted supplier for a traceable inspection plan before release. Keep the drawing revision and acceptance basis with each checkpoint so the inspection provider can identify which pieces and connections belong to that lot.

  1. Mill certificate in

    Request a sample mill certificate and compare grade and heat number with a proposed piece-mark list. At receiving, an inspection provider can sample the traceability trail against the accepted drawing revision.

  2. Cut, cope, fit

    Check how the bid handles bolt-hole gauge and fit-up tolerances. If a trial assembly is in the inspection scope, record which connection is assembled and which dimensions are measured.

  3. Procedure and weld

    Request the applicable welding procedure and welder qualification scope. Identify visual or nondestructive examination requirements in the purchase documents and ask for reports indexed to joint location.

  4. Coating and pack

    Ask for the coating specification, inspection readings and bundle dimensions before dispatch. For consolidation and export coordination, reconcile the supplier packing list, commercial invoice and carrier booking against the bundle marks. Have the buyer or appointed broker confirm declaration and destination requirements. A package can meet its coating target yet exceed the carrier limit once dunnage and lifting access are included.

A quality management certificate describes a system within its documented scope. Verify issuer, validity and covered operations before relying on a certificate, and route structural acceptance to the project professionals.

Documents available on request

Request the documents needed for the project stage. A layout for budget review, an issued-for-construction drawing and a packing sketch carry different revision purposes and should have different release notes.

Reference span and eave fields Pre-engineered frames Project-specific issue
Load criteria blank, wind snow seismic All portal frames Project-specific issue
Installation bolt order and torque log Bolted knock-down frames Project-specific issue
Coating scope note, inland versus coastal Primary paint and Z purlins Project-specific issue

Send the basis with the span

Send the intended use, site country and current design basis. We will organize supplier responses by scope and identify information each bidder needs before confirming price or delivery.