Dean Steel Buildings

Request a Sourcing Quote from Dean Steel Buildings

Steel procurement brief with a frame drawing

Tell us what the building must do, where it will stand and when it needs to arrive. Dean Steel Buildings coordinates procurement independently from China. It operates separately from the original brand and has no distribution authorization from that brand.

Go to the form

Project location and document needs

Projects in the Americas

Use the form for projects in the Americas. Include the site location and ask the project engineer to provide design load criteria with the applicable units.

A location-specific drawing and document register helps compare scope for US, Canadian and Mexican projects.

Projects in Europe

For European projects, add the destination country, required documentation language and relevant national annex where applicable.

If a bid mentions EN 1090 or a local code, ask for scope evidence and have the project’s qualified reviewers determine applicability.

Other destinations and shipping

For other destinations, give the delivery port, site access and preferred handover point. A port delivery can leave inland haulage and unloading outside the bid.

Share container or route constraints with the quote request. Consolidation depends on bundle size, shipment timing and carrier acceptance.

What to put beside the form

Steel building procurement desk and shipping documents
  • Model if known: PEB-18, PEB-24, PEB-30 or PEB-36.
  • Clear span, eave, bay count and building use.
  • Design wind speed, ground snow load and seismic basis, with units.
  • Delivery port and whether cladding is in the same shipment.

The website form routes procurement enquiries. State the best contact method and time zone for a reply. Include a drawing revision number instead of sending sensitive project documents in the first message.

Enter clear span, eave height, bay count and intended use. Give the design wind, snow and seismic basis if available, and mark unknowns explicitly. Describe large doors, crane loads, attached structures and cladding scope. For a knock-down frame, ask the supplier to identify the longest bundle and site bolt scope. For welded assemblies, check maximum transport envelope and lifting arrangements. Include the port, required handover date and who will handle inland delivery. These details let us compare sourcing proposals and flag design decisions for the project team.